Alyeska Resort lift upgrades for 2008/9

Sat 30 August 08

Chairlift #3 is being replaced with a quad chair and Chairlift #7 gets a mid-way unloading point

Alyeska Resort is finalizing the over $3 million dollar lift upgrade for the Winter 2008-2009 season.

Chairlift #3 is being replaced with a fixed grip quad chairlift manufactured by Dopelmayrctec. The new lift alignment places the unloading station halfway between the old top station and the top of lift #7. The bottom station has been moved closer to the Sitzmark deck. The new fixed grip high speed quad lift will provide greater uphill capacity while eliminating a large amount of stops per ride due to passenger loading and unloading.

Chairlift #7 is being modified to include a midway unloading station and a conveyor loading system at the bottom station. These improvements will allow better utilization of the terrain for lower level skiers and allow the lift to be operated at a higher speed than in the past. Providing a more streamline access point for kids and adults accessing the beginner lift directly behind the Hotel Alyeska. Alyeska Resort will provide guests learning the sport a much easier loading and unloading experience encouraging them to come again and again.

Alyeska Resort has been working hard to improve the overall guest experience for families and beginner skiers and riders. Both lift projects are scheduled for completion in September 2008.

Related news

New boxes arrive at Panorama, BC
For the Showoff Terrain Park Designer, Eric Lange, Christmas came early last week, as he eagerly watched over 200 feet of brand new boxes roll into Panorama Mountain Village -6Nov08

Prali terrain park breaks new ground
The small and currently pretty unheard of resort Prali in Italy have been busy with the JCB's forming the new terrain park and they've also put in an order for rails. Not only that but they've only gone and created 2 new pistes as well. -6Nov08

Changes at Zermatt
New snowmaking system with can produce snow at high temperatures, the much needed Glacier restaurant should be open at the top of the Matterhorn glacier paradise but best of all the new Stockhorn t-bar will open up some cool freeriding terrain -7Oct08

Val Thorens to improve parks for 2008/9
An much enlarged terrain park, addition of another drag lift to service it, and a new boardercross are the major changes this season -30Sep08

Vallnord area in Andorra spends huge for 2008/9
new 6-seater detachable chairlift in Arinsal, a remodelled terrain park and the obligatory snowmaking improvements make up a 10million euro spend this season -30Sep08

Related categories

:: Alyeska stories
:: Resort improvements stories

News feed | News feed

AddThis Feed Button Add to Google

Online:38 register/login

Page HISTORY