A-Basin Announces New Lift for 2010-2011 Season

Photo: Leitner-Poma
Wed 30 December 09
This summer A-Basin Ski Area will begin construction on a new detachable quad chairlift. The new lift will replace the Exhibition fixed grip triple chair located in the base area
Detachable quad chairlift to replace current base area triple chair.
This summer A-Basin Ski Area will begin construction on a new detachable quad chairlift. The new lift will replace the Exhibition fixed grip triple chair located in the base area, which was installed in 1978. The new lift will have a capacity of 2000 people per hour, a length of 2877 feet and have a vertical rise of 719 feet. The ride time will be just under three minutes, half the time of the current lift ride from base area to mid-mountain.
Construction is scheduled for mid-June and will not impact the current season’s closing date (tentatively scheduled for June 6, 2010). The top terminal of the new lift will be slightly realigned uphill and to the west away from Black Mountain Lodge. The lower terminal will remain in the same location.
A contract has been signed with Leitner-Poma to build and install the lift which will cost approximately four million dollars. The new detachable lift will enable beginner and intermediate guests to load and unload more easily, resulting in fewer stops and starts on the ride to mid-mountain. In addition, with the new quad chairlift, Black Mountain Lodge will be more accessible for weddings and special events throughout the year.

similar lift at Marmot Basin
Photo: Leitner-Poma
Alan Henceroth, Arapahoe Basin COO and General Manager is excited to upgrade the current lift, “With its increased capacity, shorter ride time, and ease of loading, the new detachable chairlift will be a tremendous benefit for our guests. The new lift will provide rapid, easy access to the upper mountain, Montezuma Bowl, and Black Mountain Lodge. Each year we receive hundreds of comments suggesting we make this change. Finally, after working on this project for the last five years, we are very excited to christen a new chairlift for the 2010-2011 season.”
Arapahoe Basin is taking suggestions for the name of the new lift. A 2010-2011 Arapahoe Basin Season Pass or $300 gift certificate to Arapahoe Sports will be given to the person whose suggestion is selected. If multiple people provide the winning selection, the award will be given to the first suggestion received.
Send suggestions to alanh@a-basin.net.
Related Pages
-
Ischgl spends EUR8million on new lift for 2010/11
The new eight-million euro Lange Wand chairlift will run from the Höllenkar Valley, a little above the Höllboden restaurant, up to the Greitspitz, Ischgl's top station at 2,872-metres -17Jul10 -
US$4m spending at Whitetail for 2010/11
New 1800ft beginner trail, improved snowmaking and a new grooming machine top the list of improvements for 2010/11 at Whitetail in Pennsylvania, USA -29Jun10 -
A-Basin closes for the season but Mammoth remains
A-basin is the last of the Colorado resorts to close for the season after opening way back in October. Mammoth in California still has 29 runs open and is scheduled to stay open until July 5th -7Jun10 -
New lift at Vail for 2010/11 season
Vail resorts are spending a whopping $75million on improvements across their 5 resorts. In Vail the High Noon Lift (Chair 5) will be replaced with a new high-speed quad lift as well as other changes -7Jun10 -
Plenty of fresh snow on the glaciers - snow update
Low temperatures and fresh snow for Alpine glaciers, Northern Europe's highest ski area opens for summer ski season. Six ski areas still operating in North America, some reporting fresh snow. Northern Europes highest peak opens for summer ski season. Skiing under midnight sun begins at Riksgransen. -19May10

