Permanent big air kicker at Treble Cone for 2010

Thu 18 March 10
A FIS specification big air kicker, start of the access road improvement plan, and an extension of its ski improvement programme have been announced today by Treble Cone Ski Area
A site in the Main Basin has been identified for a permanent big air kicker, built to FIS (Federation International de Ski) specifications. The purpose built feature will compliment the natural freeride terrain Treble Cone is renowned for and provide a spectacular venue for international standard Big Air competition overlooking the famous Treble Cone view. Its location within sight of the main six-seater express chairlift allows all mountain-goers to enjoy the spectacle.
Treble Cone has a strong focus on high-end improvement and for 2010 it has extended its Ski Achievement products to cover eight weeks from mid-July to mid-September. Courses include two dedicated Women’s Ski Weeks, designed by women for women and aimed at the intermediate to advanced skiers and boarders wanting to move to the next level. There are also Ski Achievement Week Camps starting every Monday from 19 July through to 13 September and an All Mountain Riders programme for snowboarders wanting to take full advantage of Treble Cone’s legendary terrain under the expert guidance of Treble Cone’s instructors.
2010 will also see the start of a staged five-year road improvement project, starting with the installation of a small length of barriers in key points along the mountain access road. And for those who want to check out the conditions from anywhere in the world, Treble Cone has installed a new webcam system that will take high resolution images, not only static shots of the ski field, but also panning from the Lake, up the Main Basin to the top of the six-seater express. The images will also be relayed to screens at the base building so skiers and boarders can check out the weather at the top and in the Saddle without leaving the comfort of the café.
Treble Cone will open on 24 June with an anticipated closing day of 3 October. For further information, visit www.treblecone.com.
Related Pages
-
New Transceiver Park at Nevis Range
A new Transceiver Park at Nevis Range is now open for practicing search and rescue scenarios using transceiver, shovels and probes. -29Jan12 -
New fencing at the Nevis Range
The Engineers have been busy building new fencing on the hill A total of 1200 metres of fencing is either completely new, or has been re built. 900 metres of this fencing is brand new rail style fencing. -21Nov11 -
New 6 Seater Chairlift For Verbier 2011-2012
Verbier is set to open a New 6 seater chair lift in Mayentset! To replace the two chair lifts at Mayentzet and La Combe. -9Nov11 -
New Quad chairlift at Mt.Hood for 2011/12
Mt. Hood Meadows is constructing its first lift since 2005. Stadium, one of Meadows’ original lifts, is being replaced with a new generation Poma high speed detachable quad -30Sep11 -
Fernie getting new Polar Peak Lift for 2011
The Polar Peak Lift adds an above tree-line Bowl experience with over 22 new runs -17Sep11
Related categories
Donate to Snow-camp
We've put a team together for the Everest Challenge on the 25th January in Morzine this year. Support team WSG by making a donation, and help us raise lots of money for Snow-camp
MORE INFORMATIONMAKE DONATION NOW!
Treble Cone, New Zealand
Freestyle: 70% - Natural half-pipes & a park
Pistes: 68% - Some good pisted slopes
Related pages
Main headlines
- The ROXY SNOW PRO 2012 will start tomorrow ! -9Feb12
- World Snowboarding Championships Feb 2012 -9Feb12
- Gillings Ranked World No 5 -9Feb12
- Snow Report Week Ending 11 February, 2012 -9Feb12
- First footage from the Red Bull Supernatural -7Feb12






